(08) 9281 9281 admin@e2o.com.au

Commissioning and Start-Up support of the Worsley Multi Fuel Cogeneration (WMFC) project. Two coal/biomass circulating fluidised bed boilers, both capable of producing 550 tonnes per hour of steam, and each with a 57MW back pressure steam turbine